Skip to content
Anaheim Air
Schedule service
Rooftop condensers on a commercial building with the city skyline behind
Commercial

Rooftop units, walk‑ins, and chillers, kept running

Service, installs, and controls for restaurants, offices, retail, and property managers across four counties. Crane work and after-hours calls included.

Here for your own house?Go to residential
Who we hold contracts with
Restaurants
Walk-ins, prep lines, kitchen make-up air
Offices
Packaged units, zoning, tenant fit-outs
Retail
Storefront comfort, display refrigeration
Property managers
Multi-site portfolios, one point of contact
Industrial
Chillers, process cooling, plant rooms

What we are on site for

Packaged rooftop unit on a flat commercial roof
01 / Emergency repair

Temperature first, plan after

Down units get the space back to temperature before anybody talks about capital. You get the readings, the failed part, and a written option for the permanent fix.

Package unitsSplit systemsCompressorsAfter hours
02 / Refrigeration

Product loss is the real bill

Walk-ins, reach-ins, keg rooms, and prep tables. Refrigeration calls jump the queue, because a failed evaporator costs a kitchen more per hour than the repair does in full.

Walk-in coolersFreezersCondensing unitsDefrost controls
Walk-in cooler evaporator above a keg room
Central plant chiller and compressor in a mechanical room
03 / Plant & projects

Machinery most crews walk away from

Chillers, three-phase power, VFDs, and mechanical rooms are ordinary work for this crew. Design, install, and commissioning coordinated with your GC, on the schedule you were given.

ChillersControls & VFDsSheet metalCrane setsTest & balance
Service contracts

A contract you can actually read

Every unit on your site is listed with its own tasks and interval. After each visit you get what was checked, what was replaced, and what is coming, so budget season stops being a guess.

Ask for a site walk
Asset list per siteTagged
Written visit reportsEvery call
Priority responseContract sites
Capital planning notesYearly
One phone numberNo call center

“They were on time or early to every appointment. This was a major HVAC replacement on a preschool. They communicated with all involved in a friendly, professional manner. The work was as planned and well done. And within the budget.”

Linnea P. · Google review
5.0
on Google
22 years
Mechanical side
Priority
Contract response

Send us the site, we will send the bid

Address, roughly how many units, and what it is doing. If something is down right now, call the service line and skip the form.

Same day
Reply
After hours
Available
C-20
Licensed
Anaheim Air crew loading a rooftop unit at the truck